    產品詳細說明
    鋼邊橡膠止水帶十字接頭用在水平施工縫和豎向施工縫的交接點上,直線段用在水平或豎向施工縫,兩者用熱熔接的方式連接成整體,最終形成施工縫橡膠防水。中埋式鋼邊橡膠止水帶連接方法中埋式鋼邊橡膠止水帶熔接前需準備好熔接接頭、熔接模具、生膠片、橡膠與鋼片連接劑、打磨工具、干凈布等。
    The cross joint of steel edge rubber water stop belt is used at the junction of horizontal construction joint and vertical construction joint, and the straight section is used at horizontal or vertical construction joint. The two joints are joined together by hot fusion, and finally the rubber waterproof of construction joint is formed. Medium-buried steel-edge rubber water-stop connection bbbbbb: before the buried steel-edge rubber water-stop is welded, the weld joint, welding die, raw film, rubber and steel-sheet connector, polishing tool, clean cloth, etc. should be prepared.
    中埋式鋼邊橡膠止水帶熔接方法如下:
    Medium-buried steel-edge rubber water stop is welded as follows:
    (1)將鋼邊橡膠止水帶兩頭,即直線段與十字接頭連接端各大約100mm處的橡膠割掉,用工具,如砂輪將鋼邊打磨光滑。
    (1) Cut off the rubber at the two ends of the rubber water stop tape on the steel edge, i.e. the connecting end of the straight line segment and the cross joint, which is about 100 mm large, and polish the steel edge smoothly with tools such as grinding wheels.

    (2)將鋼邊橡膠止水帶需要熔接的兩端頭搭接處中間留下長30~40mm的空間用于接頭熔接、干凈生膠片的連接。如果生膠片占有灰塵須用干凈布擦干凈灰塵或用打磨機將生膠片表面打磨干凈后才能使用。

    (2) Leave a space of 30-40 mm in the middle of the overlap between the two ends of the steel-edged rubber water stop belt which need to be welded for the joint welding and the connection of clean raw film. If the raw film occupies dust, it must be cleaned with a clean cloth or polished with a grinder to clean the surface of the raw film before it can be used.
    (3)在已打磨光滑的鋼邊兩面涂刷橡膠與金屬粘結劑。
    (3) Rubber and metal binders are applied on both sides of polished smooth steel.
    (4)在加工打磨鋼板橡膠止水帶連接端頭的同時預熱橡膠止水帶的熔接模具好,預熱時間按電熱絲的發熱功率約在30分鐘。目的是將模具溫度控制在140~150℃度之間。當溫度計顯示模具溫度已到140~150℃即可進行后續步驟。
    (4) The welding die of the preheated rubber water stop is good while grinding the connection end of the steel plate rubber water stop. The preheating time is about 30 minutes according to the heating power of the electric heater wire. The aim is to control the temperature of the die between 140 and 150 degrees C. When the thermometer shows that the temperature of the die has reached 140-150 C, the follow-up steps can be carried out.
    (5)把需要熔接鋼邊橡膠止水帶兩端頭按步驟2搭接放入橡膠熔接模具底模的中間,連接處放滿生膠片。
    (5) Place the two ends of the rubber sealing tape with steel edge to be welded in the middle of the bottom die of the rubber welding die according to step 2, and fill the connection with raw film.
    (6)按模具的對中孔洞,輕輕放置熔接模具的頂模。在安放模具頂模的過程中要避免生膠片和熔接端頭的跑位,如果過程中鋼邊橡膠止水帶需熔接的兩端頭跑位,需重復此步驟,確保熔接兩端頭的正確位置。
    (6) Place the top die of the welding die gently according to the middle hole of the die. In the process of placing the top die of the die, the running of raw film and fusion end should be avoided. If the two ends of the steel-edged rubber water stop need to be welded in the process, this step should be repeated to ensure the correct bbbbbbbb of the fusion ends.
    (7)用千斤頂將安放好的頂模具加壓。此步驟注意的是:第一次千斤頂加壓壓力不要過大大,加壓至模具頂模和底模之間距離在2cm左右。待熔接鋼邊橡膠止水帶的生膠片硫化一段時間,約5~10分鐘后再進行千斤頂的二次加壓。
    (7) Pressure the mounted jacking die with a jack. This step is to note that the pressure of the first jack should not be too large, and the distance between the pressure and the top and bottom dies of the die should be about 2 cm. The raw rubber sheet of the welded steel edge rubber water stop tape is vulcanized for a period of time, and the second pressure of the jack is applied after about 5 to 10 minutes.
    (8)千斤頂二次加壓是將模具縫隙加壓至設計鋼邊橡膠止水帶斷面。加壓后,保持模具溫度在140~150℃之間,時間約20~30分鐘即可開模。
    (8) The second pressurization of the jack is to press the die gap to the section of the rubber water stop at the design steel edge. After pressing, the mould temperature is kept between 140 and 150 degrees C, and the mould can be opened in about 20 to 30 minutes.

    (9)開模檢查。如檢查發現生膠片熔合不飽滿,存在缺膠、開裂、分層等現象需返回至步驟1重新開始鋼板橡膠止水帶的端頭熱熔接。如檢查發現橡膠止水帶接頭處熔合飽滿,不脫膠,可以進行下一步驟。


    (9) Opening inspection. If it is found that the raw film is not fully fused, there are glue shortage, cracking, delamination and other phenomena, it is necessary to return to step 1 to restart the hot fusion at the end of the steel sheet rubber water stop. If the inspection finds that the joint of the rubber water stop belt is fully fused and does not degum, the next step can be taken.
    (10)將已熔接好的鋼邊止水帶的鋼邊連接處用釘子或鋼絲連接好,或將此接頭連接處的鋼邊焊接牢固。
    (10) Connect the steel edge joints of the welded steel edge water stop strip with nails or steel wires, or weld the steel edges of the joints firmly.


    在線詢盤/留言 請仔細填寫準確及時的聯系到你!
    您的姓名: * 預計需求數量: *    
    聯系手機: * 移動電話或傳真:
    電子郵件: * 所在單位:
    咨詢內容:
    *
     
    更多..本企業其它產品

    機電之家網 - 機電行業權威網絡宣傳媒體

    Copyright 2011 jdzj.com All Rights Reserved技術支持:杭州濱興科技有限公司

    銷售熱線:0571-28292387  在線客服:0571-87774297   展會合作/友情連接:0571-87774298  
    網站服務咨詢:0571-28292385   投訴熱線:0571-87774297  
    網站經營許可證:浙B2-20080178-4


    主站蜘蛛池模板: 护士们的放荡交换全文| 欧美成人手机在线视频| 国产一区中文字幕| 欧美色图五月天| 国产精品视频铁牛tv| ipx-412天海翼在线播放 | 国产99久久精品一区二区| 人人玩人人添人人澡mp4| 国产精品美女久久久免费| Channel| 好男人好资源在线观看免费播放高清| 久久不见久久见免费影院www日本 久久不见久久见免费视频7 | 日韩欧美第一区二区三区| 亚洲人成网7777777国产| 欧美黑人巨大videos极品| 从镜子里看我怎么c你| 精品国产一区二区三区AV性色| 国产97在线观看| 蜜桃麻豆WWW久久囤产精品| 国产在线播放网址| 国产在线a免费观看| 国产精品9999久久久久仙踪林| 69p69国产精品| 国产色xx群视频射精| 91蜜桃在线观看| 在线中文字幕有码中文| 99视频在线精品免费| 天天操2018| jux900被公每天侵犯的我| 嫩草影院在线视频| 一级毛片免费观看不卡视频| 成人欧美日韩一区二区三区| 中文字幕电影资源网站大全| 日产国产欧美韩国在线| 久久久久国产精品| 日本三级特黄在线观看| 久久久一本精品99久久精品88| 日本妇乱子伦视频| 久久久久亚洲av无码专区| 日产精品一卡2卡三卡4乱码久久| 久久久久亚洲av无码专区蜜芽|